Summary
- Closed for EoI
- Profile Type
- Technology request
- POD Reference
- TRDE20250617018
- Term of Validity
- 18 June 2025 - 18 June 2026
- Company's Country
- Germany
- Type of partnership
- Commercial agreement with technical assistance
- Targeted Countries
- All countries
Contact the EEN partner nearest to you for more information.
Find my local partner
General information
- Short Summary
- A german SME is looking for a supplier of electrical heating systems who can manufacture a heating system for a tubular reactor (2.5m long, DN25) that heats the reactor to 500°C. Ideally with an integrated system to be able to dissipate heat during exothermic processes.
- Full Description
-
The company offers everything from engineering, calculations and the necessary relevant design checks through to production. It takes care of process engineering tasks in complex plant construction. The aim is to achieve innovative, technically and economically optimised solutions.
Now the german SME is looking for a supplier of heating systems who can manufacture a heating system for a tubular reactor (2.5m long, DN25) that heats the reactor to 500°C. Ideally with an integrated system to be able to dissipate heat during exothermic processes.
The tubular reactor (2.5m long, DN25) has two different load scenarios.
Load scenario 1: The interior of the reactor must be heated to 500°C.
Load scenario 2: The interior of the reactor is heated to 350°C. The chemical process that then begins is exothermic. The released heat must be dissipated via an active system, e.g. an integrated pipe system with compressed air or thermal oil.
It is important that the reactor can handle both scenarios. Ideally, the heating system should have several heating zones, at least 5, in order to individually adjust the temperature curve in the reactor.
Furthermore, the heating system must be able to be opened so that the reactor can be removed. The reactors are positioned vertically (not horizontally!). - Technical Specification or Expertise Sought
- The supplier of the heating system should have several heating zones, at least 5, in order to individually adjust the temperature curve in the reactor.
- Stage of Development
- Already on the market
- Sustainable Development Goals
- Goal 13: Climate Action
- Goal 9: Industry, Innovation and Infrastructure
- Goal 8: Decent Work and Economic Growth
Partner Sought
- Expected Role of a Partner
- The supplier should already have a ready-made heating system in its range or be able to customise it to the customer's specific requirements at short notice
- Type and Size of Partner
- Big company
- SME 11-49
- SME <=10
- SME 50 - 249
- Type of partnership
- Commercial agreement with technical assistance
Dissemination
- Technology keywords
- 02003003 - Component integration
- 09001010 - Thermal material testing
- 09001009 - Sensor Technology related to measurements
- 04002004 - Furnace and boiler technologies
- 04007005 - Heat pipes
- Market keywords
- 09003001 - Engineering services
- 03007003 - Other analytical and scientific instrumentation
- 08003007 - Other industrial equipment and machinery
- Sector Groups Involved
- Maritime Industries and Services
- Renewable Energy
- Targeted countries
- All countries